Principal contractor 0
John Radcliffe – Level 5, photograph 1 of 72
Healthcare

John Radcliffe – Level 5

Refurbishment of level 5 surgical wards

ClientOxford University Hospitals NHS Foundation Trust
LocationHeadington, Oxford
SectorHealthcare
Programme40 weeks
Overview

Project summary

Marcon Construction was appointed to deliver a comprehensive design and build refurbishment of Level 5 at the John Radcliffe Hospital, enhancing critical care capacity during the COVID-19 pandemic. The project encompassed the transformation of multiple wards to meet evolving healthcare needs.

What we delivered

Scope of works

  1. Ward 5C/D: Refurbished to house a specialist Respiratory Unit, comprising: 22 en-suite side rooms
  2. 2 specialist respiratory beds
  3. 6 beds for patients transferred from High Dependency Units
  4. 2 beds specifically designed for patients with cystic fibrosis
  5. Ward 5E/F: Redeveloped as an Acute Medical Short Stay Ward, providing: 24 additional beds across open bays and private rooms
  6. A bright, spacious, and modern clinical environment
  7. Increased side-room capacity to support infection control
  8. Bespoke rooms designed in line with bariatric care best practices
  9. Integrated en-suite bathrooms to enhance patient privacy
  10. Installation of monitoring systems linked to electronic patient records
  11. New ventilation systems throughout the entire ward

Planning a complex project? Let’s talk early.

We’re always happy to have an early, confidential conversation about your project. The best outcomes on our projects were shaped before anyone was on site.