Principal contractor 0
C&W Hospital – David Erskine Ward, completed by Marcon Construction
Healthcare

C&W Hospital – David Erskine Ward

Construction of wards and isolation suites

ClientChelsea and Westminster Hospital NHS Trust
LocationChelsea & Westminster Hospital, London
SectorHealthcare
Programme24 weeks
EnvironmentLive and occupied
Overview

Project summary

Live environment

Marcon redeveloped David Erskine Ward at Chelsea and Westminster Hospital into a 28-bed respiratory unit with five negative-pressure isolation suites, on a 24-week programme, to add respiratory care capacity during the COVID-19 pandemic.

01

The challenge

The ward sat directly below live operating theatres and above a working maternity unit.

A multi-specialty ward had to become a specialist unit for advanced respiratory therapies, including CPAP and high-flow oxygen.

02

Our approach

Noise and vibration were controlled, working hours were aligned with clinical schedules, and the team liaised with hospital staff throughout to coordinate sensitive activities.

Flexible zoning, with sliding doors and reconfigurable spaces, was built in to support infection control and pandemic preparedness.

03

Outcome

The unit was completed within the 24-week programme, adding respiratory care capacity when the hospital needed it.

What we delivered

Scope of works

  1. 28-bed respiratory unit
  2. Five negative-pressure isolation suites
  3. Flexible zoning with sliding doors and reconfigurable spaces
  4. Facilities for CPAP and high-flow oxygen therapies
What mattered on this project

Directly below live operating theatres and above a working maternity unit, during the COVID-19 pandemic.