This was a scheme to construct a new observation unit within an existing external courtyard at the hospital. It was particularly challenging as it was to be built in a land locked part of the hospital and could obviously not have an impact on the clinical teams. The Existing space was overlooked on all sides by clinical departments and was only accessible through the hospital corridors. and despite design issues at the start of the project was delivered on time and on budget.

Client

Buckinghamshire NHS Trust

Duration

10 Weeks

nhs logo
IMG_6272-1000 IMG_6306-1000
Scroll to Top
Scroll to Top