The existing waterproofing to the multi-storey car park was in disrepair in various locations and required a solution to rectify and eliminate water ingress to the structure below. As a result we proposed Triflex ProDeck as a long term solution. The floor is subjected to continuous wear, meaning that low-maintenance, water-repellent, highly durable solutions are required.

Sector

Roofing

Duration

2 Weeks

Scroll to Top