Marcon was selected to deliver 9 x fast tracked, 9 anti-ligature bedrooms with private en-suites. This was the first within the UK to deliver this specification within an acute Hospital status. This  anti-ligature specification to respectfully care for the  mental health patients of the Hospital. 

Sector

Healthcare

Duration

12 weeks

Contract

JCT Design and Build Contract 2016

Client

Scroll to Top
Scroll to Top